Metro Line 2 glass railings project in Panama !
Mrs. Andy
September 6, 2019
The works include 17 stations and 21 kilometers of elevated railway lines, connecting the stations from the district of San Miguelito to 24 de Diciembre. It includes three different station typologies: Central shafts, gantry and special stations. The initial design accommodates a flow of 16,000 passengers per hour in each direction.
Ace Architectural Products Co., Ltd provided all of the 17 stations related stainless steel glass balustrade, the total quantity is more than 8,000 liner meters long.
Share